Commission:

As part of the regeneration of Park Royal, Sheriff Construction was contracted to manage the brick/ block work for a total of 138 residential units with a combined value of more than £20m.

The mixed tenure scheme includes 1, 2 and 3 bedroom apartments, under croft car parking for 150 cars with hard and soft landscaping (including resin bonding). The project was built to achieve Code for Sustainable Homes ‘Level 4’.

Sheriff also managed a roofing contract at this site. Take a look here.

Park Royal (Brickwork)
Date

24 July 2014

Client

Higgins

Category

BRICKWORK